About the project:

Tunnelling Solutions worked with John Holland to complete a 1.2 diameter, 360 mm pipe jack at Level Crossing Removal Works on Glenroy Road in Melbourne.

Project snapshot:

  • We supplied all equipment and labour, using an AVN1200 slurry machine provided by the client.
  • The geology was challenging with almost the entire drive in soft clay and low cover (600m) at the receival shaft and adjacent live rail.
  • The conditions had the potential to delay program and increase costs.

Completed works:

As experts in our field, Tunnelling Solutions approach every project with creativity and innovation to provide best practice solutions.

  • Provided a cost effective and productive solution to redesign the slurry treatment plant at 100m into the drive.
  • This resulted in improved productivity, a decrease in slurry costs and delivery of project to schedule.