Norwest Pedestrian Tunnel
Client
CPB/John Holland
Year
2016-2017
Location
Sydney, Australia
About the project:
The Norwest Pedestrian Link connected the New Sydney Metro Norwest Station with the Norwest shopping precinct via a tunnel under Norwest Boulevard.
Project snapshot:
- This project came with the complex task of de-stressing some previously installed cable anchors.
- With our innovative approach and years of experience, we developed a small timber heading hand driven tunnel to reach the position of the cable anchors.
Completed work:
- Designed and constructed escalator ramp, shaft excavation with shotcrete support.
- Tunnel consisting of 38m long canopy tubes, tunnel excavation and a waterproof layer followed by a permanent shotcrete lining.